Browsing College of Engineering, Design, Art and Technology (CEDAT) by Title "Upgrading of Masaka-Bukakata Road (41km) from gravel to paved (bitumen standard)"
Now showing items 1-1 of 1
-
Upgrading of Masaka-Bukakata Road (41km) from gravel to paved (bitumen standard)
(Makerere University, 2022-09-22)Masaka-Bukakata road was a gravel road stretching from Nyendo town to Bukakata Landing site and Lambu fishing site. This presented a connectivity problem to the users with a lot of defects and challenges not limited to ...