Now showing items 22-41 of 218

      xmlui.ArtifactBrowser.ConfigurableBrowse.title.column_heading
      Calorific characterization of faecal sludge and its use as fuel: A case study of Kampala [1]
      Capacity utilization of National Water and Sewerage Corporation (NWSC) water supply system in Northern Uganda: a case study of Arua Municipality [1]
      A case for acceleration rather than extension of time on construction projects in Uganda. [1]
      A case study of the construction of the Faculty of Business Computing at Makerere University Business School (MUBS), Nakawa Campus [1]
      A case study of the effect and significance of project management on the construction of Vehicle Inspection Station in Mbale Municipality [1]
      Causes and impacts of construction disputes in the Ugandan road construction sector. [1]
      Challenges of subsurface drainage of urban roads in low lying areas : A materials perspective [1]
      Characterization of grey water in Kyebando, Kisalosalo and determination of the design criteria for greywater systems treating water for irrigation [1]
      Coloured sculpture: an analytical visual study of the use of colour in sculpture: a guide to a practical study of the use of colour in sculpture in Uganda with special reference to Makerere University School of Fine Art [1]
      A comparative analysis of the potential of robust coding schemes in emerging wireless technologies [1]
      Construction and distribution of fresh water supply system at Kazinga [1]
      Construction management functions in public buildings in Uganda: A case study of Rwenzori region local governments. [1]
      Construction of 22 No. public toilets in Kawempe Division (Kawempe Sanitation Improvement Project (KSIP) [1]
      Construction of 22 No. public toilets in Kawempe Division: Kawempe Sanitation Improvement Project (KSIP) [1]
      The construction of aftersales support centre for Toyota at Namanve, Mukono [1]
      Construction of Centenary bank, Mukono branch at plot 115 & 117, block 107, Mukono District. [1]
      Construction of HSC two storied block at St. Mary's College Kisubi (SMACK) [1]
      Construction of Infinity Courts, Plot 7, Roscoe Road, Kololo, Kampala City. [1]
      Construction of Lubumba and Kawumulo primary schools in Mubande district. [1]
      Construction of Mixed Use Development on Plot 92d Old Kira Road, Nakawa. [1]