Now showing items 61-70 of 216
Application of high resolution satellite imargery for updating topographic maps of Uganda
(Makerere University, 2019-05-05)
Uganda like most of the countries in Africa have completed their initial topographic base series
mapping using aerial survey. Those areas which have not yet been mapped are either the most
remote and inaccessible mountainous ...
Contract for the Interconnection of electric grids of Nile equatorial lakes countries (Uganda Part - Lot C) for the Contruction of substation for the interconnection of Uganda-Kenya and Uganda-Rwanda electric grids (Lot C) Contract No. UETCL/WRKS/2011/00002
(2019-05-05)
The report constitutes an independent review of the contractor's request for extension of time and prolongation cost. This document examines the delays that occurred during the construction period. It also sets out the ...
Design and documentation for the extension of a piped water supply system in Bweramule sub county, Ntoroko district local government.
(2019-11-15)
This report is a PGD industrial training Civil Engineering report comprising of the works that I practically trained in and summarized in three Chapters which are included in the Introduction, Documentation and Design ...
Construction of reinforced concrete tank stand development in Rwentuuha, Kyegegwa District, Uganda
(Kamoga, J.M. (2019). Construction of reinforced concrete tank stand development in Rwentuuha, Kyegegwa District, Uganda. Unpublished Master's dissertation. Makerere University, Kampala, Uganda, 2019-05)
Throughout the execution stage of a project, measures taken to ensure project control and record keeping (data collection) become tools of utmost importance to managers and other stake holders in the construction process. ...
Design and Evaluation of an Electricity Theft Monitoring System on a Three Phase Meter.
(2019-08-21)
Umeme Limited, the biggest power utility company in Uganda, estimates that electricity theft costs the company millions of dollars in annual revenues. The aim of this research was to design and evaluate a power theft ...
Proposed report on the design review and upgrading to bituminous standard of the Musita-Lumino/Busia-Majanji Road (104km)
(Makerere University, 2019-07)
This was an experiential report which included activities and the management related issues undertaken by the Contractor and the Consultant from 15th September 2014 to 31st January 2018 on Musita - Lumino/Busia Upgrading ...
Reliability of Power Transformers at Kiira and Nalubaale Power Stations
(2019-10)
This research was a case-study aimed at investigating and developing a statistical transformer model able to predict future failures at Nalubaale and Kiira power stations. The Weibull distribution was identified as an ...
Mapping the land cover changes in the Mabira forest using satelite imagery.
(2019-03-15)
Mabira Forest is the largest gazzetted forest in Central Uganda. There has been a lot of controversy surrounding Mabira Forest due to deforestation. In light of this, several campaigns and efforts have been made by various ...
Improvement of the water scrubbing technology for biogas upgrading.
(Makerere University, 2014-11)
Biogas is a renewable energy resource comprising of mainly methane, carbon dioxide, and hydrogen sulphide. Its range of uses can be increased by removing hydrogen sulphide and enhancing methane content by removal of carbon ...
Application of risk management to improve performance: The case of infrastructure projects in Mbale District
(Makerere University, 2014)
The construction industry is one of the crucial sectors in the development process of all
communities in the World. In Uganda, the central government and other development
partners, through the district local governments, ...