Construction of Buyende Town Water Supply System.
(2021-02-15)
This project report contains details for the construction of the Buyende Town Water Supply
System project, Procurement Reference Number MWE/WSDF-E/WRKS/14-15/00118 from
start to practical completion, in which the author ...
Construction of limur bridge on limur river on Latida –Bwot atum community access road in Lamwo district, Northern Uganda.
(2021-01)
As a result of economic stagnation arising out of many years of insurgency in Northern Ugaada,
the Government of Uganda instituted a number of development interventions, in which project
for Restoration of Livelihood in ...
Upgrading of Kikandwa and Buseregenyu Health Centre IIs to Health Centre IIIs
(2021-04-23)
This report details the construction methodology and the positive aspects of construction project management exercised by the author and the project team at large while part of the team that implemented upgrading of Kikandwa ...
Exploring the use of earth observation techniques for monitoring outcomes of wetland restoration interventions : a case of Limoto in Pallisa District
(Makerere University, 2021-01-27)
Monitoring outcomes of wetland restoration interventions can contribute to the improvement of restoration design and provide data to inform critical decisions such as prioritizing what actions to take, where, when and how ...
Optimisation of recycled polyethylene terephthalate plastic bottle fibres in glasscrete
(Kampala, Makerere University, 2021-10)
Cement and concrete production which accounts for between 5% to 8% global CO2 emission are
a growing environmental concern considering their high construction dependence. These coupled
with non-biodegradable household ...
Effect of bed joint mortar thicknesses on the flexural strength of non-reinforced burnt clay brick walls
(Makerere University, 2021-12)
Mortar binds the masonry units together, it is specified in most standards that the mortar joints should be within 10-12mm, though this has not been followed in some cases. This research looked into determining the effect ...
Effect of natural organic matter composition on performance of conventional water treatment processes
(Makerere University, 2021-11)
The presence of natural organic matter (NOM) in surface water sources poses various challenges in drinking water treatment processes.Conventional coagulation is being applied in most of the treatment plants in Uganda and ...
Effect of grade and climbing lane length on performance of heavy trucks on two lane rural roads in Uganda
(Makerere University, 2021-10)
The grade and length of climbing lane affect performance of heavy trucks, leading to significant speed reductions, safety risks due to increases in passing manoeuvres and a reduction in the quality of traffic flow due to ...
Determining vulnerability to impacts of floods amongst heterogeneous communities in the Nyamwamba catchment, Western Uganda.
(Makerere University, 2021-04-10)
On the 1st of May, 2013 the Nyamwamba catchment in Western Uganda experienced flash flood episodes that have re-occurred over the years, destroying property, killing and displacing residents without a corresponding reduction ...
Construction of Agweng Primary School Total Sanitation Lira District
(Makerere University, 2021-03-19)
The Government of Uganda is committed to a policy for the increased provision of safe water supply
and adequate sanitation to the whole population. Access to safe water and hygienic sanitation facilities
provides a solid ...