• Login
    View Item 
    •   Mak IR Home
    • College of Engineering, Design, Art and Technology (CEDAT)
    • School of Built Environment (SBE)
    • School of Built Environment (SBE) Collections
    • View Item
    •   Mak IR Home
    • College of Engineering, Design, Art and Technology (CEDAT)
    • School of Built Environment (SBE)
    • School of Built Environment (SBE) Collections
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Project report on construction of perimeter fence at faculty of technoscience in Muni University.

    Thumbnail
    View/Open
    MSc, Construction Management Thesis (1.365Mb)
    Date
    2020-11-09
    Author
    Aluonzi, Godfrey
    Metadata
    Show full item record
    Abstract
    The author was attached to Muni University (MU), which is located in northwestern Uganda. The University owns and operates an extensive portfolio of buildings, land, vehicles and equipment that are utilized to deliver its core mandate of teaching and research. It was established in 2013 to be a model University with a mission of providing quality education, generating knowledge, promoting innovation and empowering communities for transformation. The aim of this field attachment was to develop the student’s skills to identify study issues in management of construction projects, collect data from various sources, analyse the data and present findings in a logical way. The project ‘Construction of Perimeter Fence at Muni University’s Faculty of Technoscience’ has been one Muni University’s largest projects costed at UGX. 2,256,195,859 and funded by Government of Uganda. The contract was awarded to M/s K. G. Adubango Construction and Engineering Works Limited. The Project was supervised and managed by the technical team at the University’s Estates and Works Department. The main objective of this study was to identify the major challenges on the construction project, their likely causes, and effects on the overall performance of the project. The major challenges faced on this project included encroachment across boundaries, delays in relocation of utilities, design reviews/adjustments, difficulty in obtaining adequate supplies of some specified materials, unstable weather conditions, intermittent electricity power and limited development funding. Despite the many challenges enumerated, the project management team was able to review the designs to accommodate the client’s requirements, open boundaries and resolve complainants. The author learnt that project analysis and control were very essential in mitigating many of the management challenges that could arise during the construction project execution process.
    URI
    http://hdl.handle.net/10570/8351
    Collections
    • School of Built Environment (SBE) Collections

    DSpace 5.8 copyright © Makerere University 
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of Mak IRCommunities & CollectionsTitlesAuthorsBy AdvisorBy Issue DateSubjectsBy TypeThis CollectionTitlesAuthorsBy AdvisorBy Issue DateSubjectsBy Type

    My Account

    LoginRegister

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    DSpace 5.8 copyright © Makerere University 
    Contact Us | Send Feedback
    Theme by 
    Atmire NV