Show simple item record

dc.contributor.authorMusinguzi, Robert
dc.date.accessioned2021-03-12T13:16:23Z
dc.date.available2021-03-12T13:16:23Z
dc.date.issued2019-11-15
dc.identifier.citationMusinguzi, R. (2019). Design and documentation for the extension of a piped water supply system in Bweramule sub county, Ntoroko district local government. (Unpublished Master's Thesis) Makerere University. Kampala,Ugandaen_US
dc.identifier.urihttp://hdl.handle.net/10570/8148
dc.description.abstractThis report is a PGD industrial training Civil Engineering report comprising of the works that I practically trained in and summarized in three Chapters which are included in the Introduction, Documentation and Design Details and Conclusion. The main purpose of the training was to learn, understand and practice the basics of a good design for the water supply systems. This included but not limited to Baseline survey to assess the social economic status of the benefiting communities, Forecasting of the water demand putting into consideration the gender issues over a 20 years horizon, Assessment of capacity of the existing water supply system and propose away for the extension of the water supply system, Assessment of potential environmental impacts on the water supply system and propose mitigation measures, Conducted a topographic survey, Preparation of a detailed engineering design of the water supply system complete with costs and bid document to assist the District in the development of an improved water supply system and reporting.en_US
dc.language.isoenen_US
dc.subjectPiped water supply systemen_US
dc.subjectBweramule sub county,en_US
dc.subjectNtoroko district local government.en_US
dc.titleDesign and documentation for the extension of a piped water supply system in Bweramule sub county, Ntoroko district local government.en_US
dc.typeThesisen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record