    Analysis of Cost and Time Overruns during Construction of Public Health Facilities in Uganda: Case Study of World Bank Funded Projects

    Thumbnail
    View/Open
    Masters research report (966.1Kb)
    Date
    2019-12-12
    Author
    Kakumba, Moses
    Metadata
    Show full item record
    Abstract
    The problem of cost and time overruns in the construction industry is a global phenomenon and the health sector in Uganda is no exception. The main objective of this study was to investigate the causes of construction project cost and time overruns in Uganda's public sector. Specifically, this study was conducted to identify the causes of cost and time overruns and to rank them according to their frequency, severity and importance. The study also further sought to determine the impact of time overruns on the final cost of the project and determine the degree of significance of time overruns on the final cost of the project. Ministry of health World Bank funded project was selected as a case study as a means of validating the results of the survey. The causes of cost and time overruns were identified from literature review and were categorized such client related, consultant related, contractor related and external factors. These were subsequently ranked using mean. The main client related cause of time and cost overrun is late payment of works already executed. The main consultant related cause of time and cost overrun is delays in approving design and variation, inadequate details in drawings, design errors and omissions. The main contractor related cause of time and cost overrun is strikes by project employees and late procurement of materials. The study found out that time overruns had minimal impact on the final cost of the project
    URI
    http://hdl.handle.net/10570/7906
    Collections
    • School of Business (SB) Collections

    DSpace 5.8 copyright © Makerere University 
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of Mak IRCommunities & CollectionsTitlesAuthorsBy AdvisorBy Issue DateSubjectsBy TypeThis CollectionTitlesAuthorsBy AdvisorBy Issue DateSubjectsBy Type

    My Account

    LoginRegister

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    DSpace 5.8 copyright © Makerere University 
    Contact Us | Send Feedback
    Theme by 
    Atmire NV