Construction of reinforced concrete tank stand development in Rwentuuha, Kyegegwa District, Uganda
(Kamoga, J.M. (2019). Construction of reinforced concrete tank stand development in Rwentuuha, Kyegegwa District, Uganda. Unpublished Master's dissertation. Makerere University, Kampala, Uganda, 2019-05)
Throughout the execution stage of a project, measures taken to ensure project control and record keeping (data collection) become tools of utmost importance to managers and other stake holders in the construction process. ...
Examination of the quantity surveyor’s involvement in project execution with respect to cost control. A case study of Sama Plaza on Plot 4 Kyadondo Road
(Makerere University, 2018-07)
This is a three chaptered report prepared for Makerere University based on work undertaken on Sama Plaza project located on plot 4 Kyadondo Road. It’s comprised of the roles of project Quantity Surveyor (QS) during pre and ...
A case study of the effect and significance of project management on the construction of Vehicle Inspection Station in Mbale Municipality
(Makerere University, 2018)
This project report entails the construction methodology used and aspects of construction project management practice exercised by the author while part of the construction team during construction of vehicle inspection ...
The construction of the apron at Arua Airfield (Phase 2)
(Makerere University, 2019-07)
This report is about the Construction of the Apron at Arua Airfield-Phase 2 project, under which the author did participate as Project Manager on the Contractor’s team (Construction Manager). Detailed construction approach ...