• Login
    View Item 
    •   Mak IR Home
    • College of Engineering, Design, Art and Technology (CEDAT)
    • School of Built Environment (SBE)
    • School of Built Environment (SBE) Collections
    • View Item
    •   Mak IR Home
    • College of Engineering, Design, Art and Technology (CEDAT)
    • School of Built Environment (SBE)
    • School of Built Environment (SBE) Collections
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Proposed completion of the main library short tower / graduate wing at Makerere University Business School (MUBS)

    Thumbnail
    View/Open
    Master's Project Report (1.693Mb)
    Date
    2020-12-09
    Author
    Nankiinga, Proscovia
    Metadata
    Show full item record
    Abstract
    This report contains the construction and project management practices that the author participated in as the Contractor’s Quantity Surveyor and assistant Project Manager during the construction of the Main Library Short Tower/ Graduate Wing at Makerere University Business School. Chapter One; lays out an introduction of the project, briefly discussing the background of the project, the scope, the funders, consultants, and other stakeholders. It also states the author’s involvement from the pre-contract stage through to completion. Chapter Two; discusses the construction methodologies, activities, and contract administration procedures undertaken during the execution stage of the project. The different tools and techniques used in the actual construction that took place on-site are discussed in this chapter, right from the superstructure, through finishes and the roof. Chapter Three; discusses the project management practices implemented during the project. It includes some aspects of Contract Administration, with particular emphasis accorded to scope, cost, quality, time, procurement, risk, material, and communication management. Chapter Four; Is a discussion of some of the challenges and lessons learned during the construction of the project. The author includes what would have been done differently in order to improve the successes attained on the project. It also includes the conclusion.
    URI
    http://hdl.handle.net/10570/8470
    Collections
    • School of Built Environment (SBE) Collections

    DSpace 5.8 copyright © Makerere University 
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of Mak IRCommunities & CollectionsTitlesAuthorsBy AdvisorBy Issue DateSubjectsBy TypeThis CollectionTitlesAuthorsBy AdvisorBy Issue DateSubjectsBy Type

    My Account

    LoginRegister

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    DSpace 5.8 copyright © Makerere University 
    Contact Us | Send Feedback
    Theme by 
    Atmire NV