• Login
    View Item 
    •   Mak IR Home
    • College of Engineering, Design, Art and Technology (CEDAT)
    • School of Built Environment (SBE)
    • School of Built Environment (SBE) Collections
    • View Item
    •   Mak IR Home
    • College of Engineering, Design, Art and Technology (CEDAT)
    • School of Built Environment (SBE)
    • School of Built Environment (SBE) Collections
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Pipeline and network distribution.

    Thumbnail
    View/Open
    PGD PROJECT REPORT (1.936Mb)
    Date
    2021-04-11
    Author
    Akena, Anthony
    Metadata
    Show full item record
    Abstract
    Pipeline network and distribution system in any water supply and sanitation project is the work of the surveying department. For the effective and efficient implementation of a pipeline network and distribution system, the surveying team had to work concurrently with the consultants and the main contractor. The department had several responsibilities i.e., prior to the commencement of works, during the construction of the works and upon completion of the works. This project report presents the construction management practices learnt in water supply and sanitation project, especially under pipeline network and distribution system, carried out by the surveying department of Weihai International Economic & Technical Cooperative Co. Ltd (WIETC), contracts management practices exercised during execution stage and the application of project management knowledge areas during the project implementation. The methodology used here is both quantitative and qualitative analysis, the quantitative analysis involved analysis of the data using the cut and fill method while qualitative analysis relies majorly on descriptions of surveying techniques applied during the project and other processes like pressure tests. The project involved supply of pipes, pipe laying, testing and commissioning works of 27 kilometers of new pipelines and 22 kilometers of old network and 7 kilometers of sewer lines. For the successful implementation of a project to be achieved, good project management practices must be put in place. Failure to have proper project management monitoring and control systems can easily result in poor relationships, disputes and cost overruns on a project
    URI
    http://hdl.handle.net/10570/8353
    Collections
    • School of Built Environment (SBE) Collections

    DSpace 5.8 copyright © Makerere University 
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of Mak IRCommunities & CollectionsTitlesAuthorsBy AdvisorBy Issue DateSubjectsBy TypeThis CollectionTitlesAuthorsBy AdvisorBy Issue DateSubjectsBy Type

    My Account

    LoginRegister

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    DSpace 5.8 copyright © Makerere University 
    Contact Us | Send Feedback
    Theme by 
    Atmire NV