• Login
    View Item 
    •   Mak IR Home
    • College of Engineering, Design, Art and Technology (CEDAT)
    • School of Built Environment (SBE)
    • School of Built Environment (SBE) Collections
    • View Item
    •   Mak IR Home
    • College of Engineering, Design, Art and Technology (CEDAT)
    • School of Built Environment (SBE)
    • School of Built Environment (SBE) Collections
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Upgrading of Kyenjojo – Kabwoya road from gravel to paved (bitumen) standard (100km)

    Thumbnail
    View/Open
    Master's Project Report (2.485Mb)
    Date
    2018-07
    Author
    Olara, Churchill Basilio
    Metadata
    Show full item record
    URI
    http://hdl.handle.net/10570/6965
    Collections
    • School of Built Environment (SBE) Collections

    DSpace 5.8 copyright © Makerere University 
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of Mak IRCommunities & CollectionsTitlesAuthorsBy AdvisorBy Issue DateSubjectsBy TypeThis CollectionTitlesAuthorsBy AdvisorBy Issue DateSubjectsBy Type

    My Account

    LoginRegister

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    DSpace 5.8 copyright © Makerere University 
    Contact Us | Send Feedback
    Theme by 
    Atmire NV