• Login
    View Item 
    •   Mak IR Home
    • College of Engineering, Design, Art and Technology (CEDAT)
    • Academic submissions (CEDAT)
    • View Item
    •   Mak IR Home
    • College of Engineering, Design, Art and Technology (CEDAT)
    • Academic submissions (CEDAT)
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Proposed office development on plot 16, Army Avenue Road Nakasero, Kampala

    Thumbnail
    View/Open
    Master's Project Report (3.950Mb)
    Date
    2018-09-10
    Author
    Senoga, Gerald
    Metadata
    Show full item record
    Abstract
    The Purpose of this Report is to describe the project aspects on the construction of Lotis Towers located at Plot 16, Army Road, Nakasero Kampala which is privately owned by Mr. Samuel Lotigo under Lotigo properties Ltd. The report focuses on how the client selected the team to support with project implementation, how the project was executed, from inception to Concept Development, Study, design, Construction and post construction management, challenges faced and recommendations made. Chapter One; This chapter lays down the introduction of the field study, briefly discussing the background of the project, how the project team was selected, the scope, the funder and other respective stakeholders on the Project. The project management aspect adopted for the project is briefly highlighted in this chapter as well Chapter Two; This chapter gives an account of the project from the inception stage, through the design, tendering, contract award to the contractor, the construction stage in the order of execution with images clearly showing what was done on site from site mobilization through construction, element by element. Chapter three; This chapter evaluates the project management aspects and the key deliverables usually given much focus during project implementation which include; quality, time and cost, challenges encountered on the project during implementation and the life after project completion. Chapter four; This chapter gives conclusions and recommendations based on the information discussed in the previous chapters.
    URI
    http://hdl.handle.net/10570/6959
    Collections
    • Academic submissions (CEDAT)

    DSpace 5.8 copyright © Makerere University 
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of Mak IRCommunities & CollectionsTitlesAuthorsBy AdvisorBy Issue DateSubjectsBy TypeThis CollectionTitlesAuthorsBy AdvisorBy Issue DateSubjectsBy Type

    My Account

    LoginRegister

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    DSpace 5.8 copyright © Makerere University 
    Contact Us | Send Feedback
    Theme by 
    Atmire NV