• Login
    View Item 
    •   Mak IR Home
    • College of Engineering, Design, Art and Technology (CEDAT)
    • School of Built Environment (SBE)
    • School of Built Environment (SBE) Collections
    • View Item
    •   Mak IR Home
    • College of Engineering, Design, Art and Technology (CEDAT)
    • School of Built Environment (SBE)
    • School of Built Environment (SBE) Collections
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Construction of Jesus Cares Storeyed girls hostel for St.Philip-bwera Parish,Bwera Archdeaconry.

    Thumbnail
    View/Open
    Post Graduate Diploma in Construction Project Management Technical Report (2.021Mb)
    Date
    2022-02-22
    Author
    Asiimwe, Ronald
    Metadata
    Show full item record
    Abstract
    This report details construction and project management practices that the author participated in as the contractor’s project manager during the construction of Jesus Cares Storeyed girls hostel for St. Philip Bwera parish, Bwera Archdeaconry South Rwenzori Diocese – Kasese district. The project was one storey building for St. Phillip - Bwera parish targeting students from nearby Bwera secondary school and other surrounding institutions like Bwera School of Nursing and Midwifery. It is a requirement that a student undertaking a Post Graduate Diploma in Construction Project Management at Makerere University undergoes training on construction site to attain the practical skills on project management practices and relate the site knowledge obtained to the acquired knowledge in the lecture room. It is upon this background that the author was able join the labour contractor -Ronex Consult Engineering Ltd as a trainee contractor’s project manager. Chapter one discusses the project background, its objectives, scope and other details like the contract sum, duration and different stakeholders. Chapter Two covers project acquisition and execution of works .This chapter details the site construction activities, project management and contract administration aspects including the different techniques used in the actual construction. Chapter Three entails the challenges encountered during project implementation, solutions used to solve the site challenges and lessons learnt. Chapter Four details the conclusions and recommendations drawn by the author on the execution of the proposed storeyed Girls hostel.
    URI
    http://hdl.handle.net/10570/10202
    Collections
    • School of Built Environment (SBE) Collections

    DSpace 5.8 copyright © Makerere University 
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of Mak IRCommunities & CollectionsTitlesAuthorsBy AdvisorBy Issue DateSubjectsBy TypeThis CollectionTitlesAuthorsBy AdvisorBy Issue DateSubjectsBy Type

    My Account

    LoginRegister

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    DSpace 5.8 copyright © Makerere University 
    Contact Us | Send Feedback
    Theme by 
    Atmire NV