Statistics for An evaluation of time and cost overruns during the design and build of the Masindi (Kisanja) and the Tangi junction – Paara – Buliisa Road
Total visits
| views | |
|---|---|
| An evaluation of time and cost overruns during the design and build of the Masindi (Kisanja) and the Tangi junction – Paara – Buliisa Road | 3 |
Total visits per month
| views | |
|---|---|
| September 2025 | 0 |
| October 2025 | 0 |
| November 2025 | 0 |
| December 2025 | 0 |
| January 2026 | 0 |
| February 2026 | 0 |
| March 2026 | 3 |
File Visits
| views | |
|---|---|
| 1 |
Top country views
| views | |
|---|---|
| Uganda | 2 |
Top city views
| views | |
|---|---|
| Kyengera | 1 |
| Masaka | 1 |