Upgrading of Aston – Ntuha road 1.4km in Masindi Municipality
(2017-10-17)
This report consists of activities of design and construction for Aston Ntuha road (1.4 Km) in Masindi Municipal Council Central Division upgrading from gravel to paved standard.
The major objective of the projects is: ...
Propose office developement on plot 16, Army Avenue Road, Nakasero
(2017-08-24)
This report consists of majorly four stages of implementing an office development on plot 16, Army Avenue road Nakasero Kampala. The stages include Concept Development, Study and design, Construction Information and construction.
Investigation into the engineering properties of recycled red clay brick aggregates and crumb rubber mixtures for pavement construction
(Makerere University, 2017)
Large volumes of Construction & Demolition (C&D) waste and End-Of-Life rubber tyres produced every year cause a huge environmental problem. Both bricks and rubber wastes are non-biodegradable in nature and pose a threat ...