• Login
    Search 
    •   Mak IR Home
    • College of Engineering, Design, Art and Technology (CEDAT)
    • School of Built Environment (SBE)
    • Search
    •   Mak IR Home
    • College of Engineering, Design, Art and Technology (CEDAT)
    • School of Built Environment (SBE)
    • Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-10 of 10

    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
    Thumbnail

    Project management practice on the construction of a maternity ward at Kabahango Health Centre Grade II in Buheesi Subcounty - Bunyangabu District 

    Mugabe, Manyiraho M. Nathan (Makerere University, 2022)
    Project management practice on the construction of a maternity ward at Kabahango Health Centre Grade II in Buheesi Subcounty - Bunyangabu District. This study provides a brief review of the construction project management ...
    Thumbnail

    The construction of subcounty administration block in KOCHEKA subcounty, Bukedea district 

    Egwangu, Richard (Makerere University, 2024)
    This report is about the Construction of the Administration Block for Kocheka Sub County in Bukedea District, under which the author participated as Project Manager on the Clients’ side. Detailed construction approach ...
    Thumbnail

    The construction of subcounty administration block in KOCHEKA subcounty, Bukedea district 

    Egwangu, Richard (Makerere University, 2024)
    This report is about the Construction of the Administration Block for Kocheka Sub County in Bukedea District, under which the author participated as Project Manager on the Clients’ side. Detailed construction approach ...
    Thumbnail

    Analysis of the reliability of time schedule forecasts adopted at road project tendering in Uganda 

    Odoch, Simon Peter (Makerere University, 2024)
    This study takes a close look at the accuracy of time schedule forecasts used in road construction projects across Uganda, focusing on seven key projects. It explores the common discrepancies between the estimated timelines ...
    Thumbnail

    Design and construction supervision of Ayivu solar powered water supply system in Bidibidi Settlement, Yumbe District 

    Arumadri, Eric (Makerere University, 2022)
    This project Report is submitted to Makerere University in partial fulfilment of the requirements for Award a Post-Graduate Diploma in Construction and Project Management of Makerere University. The report covers the Design ...
    Thumbnail

    Project management and implementation strategy for the periodic maintenance of Kibuye – Entebbe Road (22km). 

    Kibuuka, Gilbert (Makerere University, 2022-05-04)
    This report was drafted as part of the requirements for completion of a Post Graduate Diploma in Construction Project Management at the College of Engineering, Design, Art and Technology, Makerere University. It contains ...
    Thumbnail

    A project report for remodelling of existing meetinghouse and construction of a new meetinghouse at Walukuba, 9-13, Tabingwa Road, Jinja 

    Kasozi, Ashiraf (Makerere University, 2020-12)
    The report details a multitude of construction and project management practices that the author participated in as part of the Consultant's project management team during the remodelling of existing meetinghouse and ...
    Thumbnail

    Navigating project management challenges in modern hospital construction during the construction phase: “a case study of the proposed hospital expansion works on plot 14B Akii- Bua Road, Nakasero for Nakasero Hospital Ltd” 

    Tebandeke, Frank (Makerere University, 2024-07)
    In this technical report, the author presents an analysis of the project management challenges encountered in modern hospital construction during the construction phase, a case study of Nakasero Hospital Expansion Project ...
    Thumbnail

    Supervison of the construction of two - classroom blocks in wakiso town council, wakiso district. 

    Seguya, Nashir (Makerere University, 2024-08-27)
    This report contains a brief review of Construction and Project management that the author participated in during the Construction supervision of a Two classroom block each at one of the Primary schools (Namusera UMEA & ...
    Thumbnail

    A case study of the impact of project management on the construction of Kiyombya Seed Secondary School, Kiyombya Subcounty, Bunyangabu District 

    Nyaruhuma, Samuel (Makerere University, 2020)
    This study offers a brief review the construction methodology and aspects of construction project management practice exercised by the author while part of the Procurement and supervision of the contractor and consequently ...

    DSpace 5.8 copyright © Makerere University 
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of Mak IRCommunities & CollectionsTitlesAuthorsBy AdvisorBy Issue DateSubjectsBy TypeThis CommunityTitlesAuthorsBy AdvisorBy Issue DateSubjectsBy Type

    My Account

    LoginRegister

    Discover

    AuthorEgwangu, Richard (2)Arumadri, Eric (1)Kasozi, Ashiraf (1)Kibuuka, Gilbert (1)Mugabe, Manyiraho M. Nathan (1)Nyaruhuma, Samuel (1)Odoch, Simon Peter (1)Seguya, Nashir (1)Tebandeke, Frank (1)Subject
    Project management (10)
    Construction management (3)construction management (3)Bunyangabu District (1)Construction industry (1)Construction projects (1)Modern hospital construction (1)Project Management, Time Schedule Forecasts, Road Construction In Uganda (1)Road construction In Uganda (1)Road maintenance (1)... View MoreDate Issued2024 (5)2022 (3)2020 (2)

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    DSpace 5.8 copyright © Makerere University 
    Contact Us | Send Feedback
    Theme by 
    Atmire NV