Search
Now showing items 31-40 of 248
Upgrading of Kikandwa and Buseregenyu Health Centre IIs to Health Centre IIIs
(2021-04-23)
This report details the construction methodology and the positive aspects of construction project management exercised by the author and the project team at large while part of the team that implemented upgrading of Kikandwa ...
Construction supervision of the office premises (ERA house) for the Electricity Regulatory Authoruty (ERA) at plot 5c1, third street, Industrial area.
(2020-12-21)
This report documents the work done by the author during the cconstruction supervision of the new
office premises, New ERA House, for the Electricity Regulatory Authority (ERA) at Plot 5C1, 3rd Street
Industrial Area.
The ...
Construction of inland revenue department office in Hargeisa, Somaliland.
(2020-12-22)
This report mainly gives an account of the procedures taken during design and implementation
including environmental and health requirements of the Construction of Inland Revenue
Department Office in Hargeisa, Somaliland. ...
Evaluating the impact of land cover change on land surface temperatures in Kira Municipality
(Makerere University, 2020-11-17)
Changes in Land Surface Temperature (LST) have often been linked to changes in land cover. There is however, lack of adequate accurate information regarding the impact of land cover change on LST especially in developing ...
Monitoring spatial-temporal changes of urban land transition using remote sensing : a case study of Lira Municipality
(Makerere University, 2020-11-30)
Lira municipality is one of the 14 pioneer municipalities earmarked by Uganda Government’s Vision 2040 to attain regional city status. The municipal’s population was reported to be at 99,551 in 2014 and projected to ...
Exploring the use of earth observation techniques for monitoring outcomes of wetland restoration interventions : a case of Limoto in Pallisa District
(Makerere University, 2021-01-27)
Monitoring outcomes of wetland restoration interventions can contribute to the improvement of restoration design and provide data to inform critical decisions such as prioritizing what actions to take, where, when and how ...
Reconstruction of Mabira dam and water facilities in Mbarara district (construction and supervision at Global International Services Ltd)
(Makerere University, 2020-12)
Mabira dam is an existing reservoir which was constructed way back in 1940/50’s but first rehabilitated in 2003. It is an earthen embankment of approximately 300 meters, 5m high with a reservoir reach/fetch of over 3km and ...
Value Enginering in the Construction of an Administration block in Bweyogerere, Uganda.
(2020-12-11)
Value Engineering (VE) is an innovative service which involves an organized approach to the
identification and elimination of un-necessary costs without loss of function. This report is
about value engineering in the ...
Optimization of the economic dispatch model for off-grid hybrid power systems with renewable energy in Uganda.
(2020-12-03)
Economic Dispatch (ED) involves serving the least cost energy to the load. The subject of economic dispatch is a challenging task which gets more complicated with the variability of the inputs or determinants. The traditional ...
Upgrading of Hoima - Butiaba - Wanseko road project (111KM) package 11 gravel to Bituminous standards.
(2020-11-10)
The 111Km Hoima Butiaba Wanseko road project lies under package II of the oil roads
and it is part of the government effort of improving the road network within the country
as well as connect the North western part of ...