• Login
    Search 
    •   Mak IR Home
    • College of Engineering, Design, Art and Technology (CEDAT)
    • School of Built Environment (SBE)
    • School of Built Environment (SBE) Collections
    • Search
    •   Mak IR Home
    • College of Engineering, Design, Art and Technology (CEDAT)
    • School of Built Environment (SBE)
    • School of Built Environment (SBE) Collections
    • Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-10 of 12

    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
    Thumbnail

    A case for acceleration rather than extension of time on construction projects in Uganda. 

    Ssemwogerere, Kenneth (2011-09)
    The Construction industry in Uganda is one of the fast growing industries in the Economy due to the increased volumes of investment in the country. However like in many other construction industries world wide, the ...
    Thumbnail

    Construction of HSC two storied block at St. Mary's College Kisubi (SMACK) 

    Ssendawula, Herbert (2019-09-09)
    Having completed the Project titled, “Expansion of HSC Two Storied Classroom Block at St Mary’s College Kisubi’ as a Project Engineer under Bucons (U) limited. Being part of the Project Team I was responsible for managing ...
    Thumbnail

    Construction of one laboratory and lecture block, one library block and renovation of existing workshops for Busitema University at the main Campus, and one new laboratory block, and renovation of existing laboratory block at Nagongera Campus. 

    Ntambi, Gasta Mutavawo (2019-07-24)
    This project report entails the construction methodology used and aspects of construction project management practice exercised by the author while part of the construction team during the infrastructure improvement of ...
    Thumbnail

    Design review and construction supervision of Kakooge Town water supply system in Nakasongola District. 

    Arinaitwe, Joseph (Makerere University, 2022-05-09)
    This report is written in partial fulfillment of the requirements leading to the award of a Master of Science in Construction Management of Makerere University. The main aim of the project was to provide clean and safe ...
    Thumbnail

    Project report for construction of Mparo seed secondary school in Kyenjojo district. 

    Kusemererwa, Stephen (Makerere University, 2022-02-18)
    This project report contains details of construction of Mparo Seed Secondary School in Kyembogo Sub County, Kyenjojo District. Kyembogo Sub County is in the north of Kyenjojo Distict and boarders Kagadi district. Mparo ...
    Thumbnail

    Technical project report for the construction of the new office block in Pallisa Dlg, Pallisa district. 

    Masaba, Enock Tandiga Arthur (Makerere University, 2023-09-22)
    Makerere University requires Post Graduate Diploma students of Construction and Project Management at the College of Engineering Design Art and Technology to participate in internship and write-up a technical report about ...
    Thumbnail

    Construction of an office building for Insurance Regulatory Authority 

    Fuuna, Paul (Kampala, Makerere University, 2020-05)
    This project report contains details about the construction of the Insurance Regulatory Authority (IRA) Office Building, located at Plot 10 Lumumba Road on Nakasero Hill, in the Central Division of Kampala, as of May ...
    Thumbnail

    The effect of COVID-19 preventive measures on performance of building construction projects in Kampala and Wakiso Districts of Uganda 

    Aturinda, Prosper (Makerere University, 2023-09)
    COVID-19 caught the world unawares as it spread from one continent to another, killing millions of people, without any immediate cure. This resulted in various governments putting in place lockdowns and other restrictions ...
    Thumbnail

    Development of a model to predict construction Cost Over-Runs of building projects in Uganda 

    Tamale-Kwio, Julius Caesar (Makerere University, 2020-08-03)
    Cost contingencies that range from 5% to 10% in budgets of construction projects in Uganda are routinely exhausted before projects are complete necessitating mobilization of more funds that results in cost over-runs. The ...
    Thumbnail

    Technical project report for the construction of the proposed Kireka Adventist Hospital. 

    Akankwatsa, Raymond Kamugisha (Makerere University, 2020-12-08)
    This project report contains details about the construction of the Proposed Kireka Adventist Hospital in Wakiso District as of January 2021. The report focuses on construction project management and contract administration, ...
    • 1
    • 2

    DSpace 5.8 copyright © Makerere University 
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of Mak IRCommunities & CollectionsTitlesAuthorsBy AdvisorBy Issue DateSubjectsBy TypeThis CollectionTitlesAuthorsBy AdvisorBy Issue DateSubjectsBy Type

    My Account

    LoginRegister

    Discover

    AuthorAkankwatsa, Raymond Kamugisha (1)Arinaitwe, Joseph (1)Aturinda, Prosper (1)Fuuna, Paul (1)Kusemererwa, Stephen (1)Masaba, Enock Tandiga Arthur (1)Naluwenda, Angella (1)Ntambi, Gasta Mutavawo (1)Runimba, Thomas (1)Ssemwogerere, Kenneth (1)... View MoreSubject
    Construction (12)
    Building (2)Construction project management (2)Uganda (2)Acceleration (1)Building Projects (1)Cost Over-Runs (1)COVID-19 (1)COVID-19 effects (1)Extension (1)... View MoreDate Issued2020 - 2023 (9)2011 - 2019 (3)

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    DSpace 5.8 copyright © Makerere University 
    Contact Us | Send Feedback
    Theme by 
    Atmire NV