• Login
    Search 
    •   Mak IR Home
    • College of Engineering, Design, Art and Technology (CEDAT)
    • School of Built Environment (SBE)
    • School of Built Environment (SBE) Collections
    • Search
    •   Mak IR Home
    • College of Engineering, Design, Art and Technology (CEDAT)
    • School of Built Environment (SBE)
    • School of Built Environment (SBE) Collections
    • Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-10 of 308

    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
    Thumbnail

    Upgrading of Nyeikunama neighborhood Muhanga town council. 

    Karugaba, Innocent (Makerere University, 2022-02-10)
    The study was carried out in Nyeikunama neighborhood which is located in Muhanga Town Council. She started as a small trading Centre. With time it has developed and expanded gradually into its present status. It is ...
    Thumbnail

    Upgrade of Pamaka Health Centre 11 to 111 under Ugift in Nebbi district local government. 

    Okecha, Jean Andrew (Makerere University, 2022-02-01)
    Post graduate students of Makerere University pursuing Diploma in Construction Project Management are required to be involved in the execution of projects to put into practice theoretical knowledge acquired at School during ...
    Thumbnail

    Analyzing the potential of Cycling in the CBD of Kampala City. 

    Euphrasius, Omeja Fuorr (Makerere University, 2023-03)
    The aim of this study was to analyse the potential of cycling in the Central Business District (CBD) of Kampala City. This research identified the factors affecting cycling, examined the city dweller’s perceptions on ...
    Thumbnail

    Predicting construction duration during the planning phase for public building projects in Uganda. 

    Nyangoma, Oliva (Makerere University, 2023-12-19)
    Time overrun is one of the major challenges faced by the construction industry today both nationally and globally. This has partly been attributed to the absence of a scientifically developed mechanism for determining ...
    Thumbnail

    Effects of Land Use Land Cover Change on Carbon Dioxide Emissions in Mbarara District. 

    Uwizeye, Fidel (Makerere University, 2021)
    To explore the impact of human activities on the global carbon cycle, carbon emission has become one of the major concerns in academic circles. Land use and land cover change directly influence carbon storage and emissions ...
    Thumbnail

    Pipeline and network distribution. 

    Akena, Anthony (2021-04-11)
    Pipeline network and distribution system in any water supply and sanitation project is the work of the surveying department. For the effective and efficient implementation of a pipeline network and distribution system, ...
    Thumbnail

    Construction supervision of a multi-storey administrative building at Law Development Centre (LDC)-Kampala 

    Luzze, Lawrence (Makerere University, 2021-03-02)
    Law Development Centre is the employer/client for the proposed contract for design and construction supervision of Multi-purpose office block at the centre. LDC-Kampala, the centre for professional and legal training is ...
    Thumbnail

    Application of GIS in crime prediction: a case study of burglary within Nakawa Division, Kampala District 

    Opio, Felix (Makerere University, 2022-02-02)
    Crime is a common social problem that affects the quality of life and the economic growth of a society. Whether causing physical harm, psychological trauma or economic setbacks, crime affects everyone. In most developing ...
    Thumbnail

    Construction of Jesus Cares Storeyed girls hostel for St.Philip-bwera Parish,Bwera Archdeaconry. 

    Asiimwe, Ronald (2022-02-22)
    This report details construction and project management practices that the author participated in as the contractor’s project manager during the construction of Jesus Cares Storeyed girls hostel for St. Philip Bwera ...
    Thumbnail

    An assessment of the spatial distribution and layout of bus terminals in Kampala’s central business district. 

    Karugaba, Simon Peter (Kampala, Makerere University, 2022-03-04)
    Kampala city comprises of several bus terminals. Unfortunately, due to the various operational problems associated with these terminals, the standards and guidelines concerning their designs and locations have been questioned. ...
    • 1
    • 2
    • 3
    • 4
    • . . .
    • 31

    DSpace 5.8 copyright © Makerere University 
    Contact Us | Send Feedback
    Theme by 
    Atmire NV
     

     

    Browse

    All of Mak IRCommunities & CollectionsTitlesAuthorsBy AdvisorBy Issue DateSubjectsBy TypeThis CollectionTitlesAuthorsBy AdvisorBy Issue DateSubjectsBy Type

    My Account

    LoginRegister

    Discover

    AuthorEgwangu, Richard (3)Were, Andrew Gilbert (3)Aguti, Janet Rose (2)Akena, Leonard (2)Aloyo, Annet (2)Asiimwe, Ronald (2)Byabashaija, Achilles (2)Drate, Ewi Christopher (2)Eriaku, William (2)Katerega, Joseph (2)... View MoreSubjectUganda (17)Construction (9)Construction supervision (9)Project management (9)Construction project management (7)GIS (7)Remote sensing (6)construction management (5)Construction projects (5)Land use (5)... View MoreDate Issued2024 (75)2023 (65)2022 (95)2021 (35)2020 (38)

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    DSpace 5.8 copyright © Makerere University 
    Contact Us | Send Feedback
    Theme by 
    Atmire NV