Browsing School of Built Environment (SBE) Collections by Issue Date "2019-07"
Now showing items 1-5 of 5
-
The construction of the apron at Arua Airfield (Phase 2)
(Makerere University, 2019-07)This report is about the Construction of the Apron at Arua Airfield-Phase 2 project, under which the author did participate as Project Manager on the Contractor’s team (Construction Manager). Detailed construction approach ... -
Proposed report on the design review and upgrading to bituminous standard of the Musita-Lumino/Busia-Majanji Road (104km)
(Makerere University, 2019-07)This was an experiential report which included activities and the management related issues undertaken by the Contractor and the Consultant from 15th September 2014 to 31st January 2018 on Musita - Lumino/Busia Upgrading ... -
Rehabilitation of Nyerere road 0.706km, Nyerere Avenue 0.42km and Kigongi road 0.80km Kabale Municipality
(Makerere University, 2019-07)The Government of Uganda, through the Ministry of Lands, Housing and Urban Development (MoLHUD) using funding from the World Bank, formulated a program, Uganda Support to Municipal Infrastructure Development (USMID), to ... -
The role of urban planning and design in the prevention of crime in Kampala City: A Case study of Kabalagala Commercial District
(Makerere University, 2019-07)The present-day crime prevention measures embraced in Uganda appear to be unsuccessful in averting crime. These approaches comprise of the criminal justice system (courts), formal/organized surveillance, social crime ... -
Upgrading Balunywa Road (700m) in Iganga Municipal Council to Bitumen Standard using low cost sealing method
(Makerere University, 2019-07)The Project chosen for this report was the design and construction supervision of Balunywa road by upgrading it to Bitumen standard using low cost sealing method in Iganga District Uganda. It is situated in eastern Uganda. ...